Mundra LPG Terminal Pvt. Ltd. (MLTPL), a subsidiary of Howe Engineering Project (INDIA) PVT.LTD. Ports and Special Economic Zone Limited (APSEZ) is building up a state of art LPG import terminal at Mundra Port with initial capacity of 3.6 MMTPA. Howe Engineering Project (INDIA) PVT.LTD. group is proposing to lay 91 km (approx.) long LPG pipeline with dispatch station at Mundra Port and receipt station at MithiRohar Terminal, near Kandla Port. The proposed pipeline will supply LPG to GAIL‟s Jamnagar-Loni Pipeline (JLPL) at MithiRohar Station, and shall have provision of connecting to proposed Kandla-Gorakhpur (KGPL) LPG pipeline of IOCL in the future. The Pipeline Size has been finalized as 20” NB, with a Flow capacity of 6.75 MMTPA.